Change Ad Consent
Do not sell my daa
Reply to thread | Syracusefan.com
Forums
New posts
Search forums
What's new
Featured content
New posts
New media
New media comments
New resources
Latest activity
Media
New media
New comments
Search media
Resources
Latest reviews
Search resources
Media
Daily Orange Sports
ACC Network Channel Numbers
Syracuse.com Sports
Cuse.com
Pages
Football Pages
7th Annual Cali Award Predictions
2024 Roster / Depth Chart [Updated 8/26/24]
Syracuse University Football/TV Schedules
Syracuse University Football Commits
Syracuse University Football Recruiting Database
Syracuse Football Eligibility Chart
Basketball Pages
SU Men's Basketball Schedule
Syracuse Men's Basketball Recruiting Database
Syracuse University Basketball Commits
2024/25 Men's Basketball Roster
NIL
SyraCRUZ Tailgate NIL
Military Appreciation Syracruz Donation
ORANGE UNITED NIL
SyraCRUZ kickoff challenge
Special VIP Opportunity
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Syracuse Athletics
Syracuse Football Board
New IPF stacks up well
.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
[QUOTE="chakka3421, post: 556388, member: 1091"] The lead architect should have completed the minimum design with detailed structural requirements in a request for a proposal (RFP) to the design/build companies. What is going out has to be a detailed plan - not a request for a new design (otherwise the IPF is not being built this year). The lead architect-consultant normally uses standard local per square foot cost estimates to come up with the initial $17 mil cost. 1st holdup is probably that options exist in initial RFP on the design based upon how much bang for buck they can get out of the winning builder. Most logical is getting detailed bid costs because the builder can generally provide "valued engineered" cost savings if options exists in the RFP. Once everyone agrees on all the options based upon what they want to spend, that's when we will finally see drawings-pics. 2nd holdup is uniqueness of the building will be between what the architect believes can be built and what the builder will state is possible to guarantee the structural integrity of the building given the weather conditions we have in the NE. You don't want this thing caving in with 7 feet of snow on the roof especially if column support is not an option. And it may end up costing more for the same thing versus elsewhere here in the NE because of weather conditions, availability of construction workers (limited right now because of all the construction projects going on), and changing prices of raw materials since construction has been picking up across the country. [/QUOTE]
Insert quotes…
Verification
What is a Syracuse fan's favorite color?
Post reply
Forums
Syracuse Athletics
Syracuse Football Board
New IPF stacks up well
Top
Bottom