Change Ad Consent
Do not sell my daa
Reply to thread | Syracusefan.com
Forums
New posts
Search forums
What's new
Featured content
New posts
Latest activity
Chat
Football
Lacrosse
Men's Basketball
Women's Basketball
Media
Daily Orange Sports
ACC Network Channel Numbers
Syracuse.com Sports
Cuse.com
Pages
Football Pages
7th Annual Cali Award Predictions
2024 Roster / Depth Chart [Updated 8/26/24]
Syracuse University Football/TV Schedules
Syracuse University Football Commits
Syracuse University Football Recruiting Database
Syracuse Football Eligibility Chart
Basketball Pages
SU Men's Basketball Schedule
Syracuse Men's Basketball Recruiting Database
Syracuse University Basketball Commits
2024/25 Men's Basketball Roster
NIL
SyraCRUZ Tailgate NIL
Military Appreciation Syracruz Donation
ORANGE UNITED NIL
SyraCRUZ kickoff challenge
Special VIP Opportunity
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Syracuse Athletics
Syracuse Football Board
the crane the crane
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
[QUOTE="sutomcat, post: 3357433, member: 27"] Let the speculation begin, I think the cables/pipes that have spouted up through most of the lower level are temporary drainage pipes, designed to funnel the water from storms to a central repository, which might just be a connection to a sewer line. I saw a lot of activity going on inside the stadium with a white crane doing something up high near mid court on the 3rd level, on the interior west wall. It looks to me as though in addition to removing the old scoreboard there, the backing frame for it was removed and another frame was put in place. It looks like the large ducts that line the top of the third deck that was used to push out air from the giant fans, and optionally pump hot air between the layers of the old roof during snow storms, have been carefully preserved. I am assuming that probably means they are planning on using them for the new AC system next year. But maybe they just haven’t gotten around to getting rid of them yet. That United Way poster in the corner has been covered up for a long time. I would guess it will be covered up again by the time the facility opens again. Looks like they took great care to cover up the home team and visitor entrances to the locker rooms, presumably to ensure no water gets into those areas. Do we know yet how the new roof is going to be put up? Is Pfeifer going to do something similar to what they did at the Olympic Stadium in London and stage the cabling for the new roof on the floor of the dome and bring it up to hang on the crown truss in one giant, coordinated effort? Anyone have any insights here? [/QUOTE]
Insert quotes…
Verification
What is a Syracuse fan's favorite color?
Post reply
Forums
Syracuse Athletics
Syracuse Football Board
the crane the crane
Top
Bottom