IPF Announcement.. Steel up 8/13/14 pics, video | Page 8 | Syracusefan.com

IPF Announcement.. Steel up 8/13/14 pics, video

So are we fully erect, now?
If not, I think we should expand the workforce:

sexy-girl-dungarees-drill-stepladder-interior-33590606.jpg
 
Last edited:
How will the team get there from the locker room in the winter?
 
Looks like the side panels have gone up on the right hand side. This thing is getting closer to be enclosed.
Yes, stopped by yesterday afternoon. The wall on the east side was mostly finished and a large part of the roof on that side is also done or near done, at least from the outside looking in.

The outside panels of the roof are a vibrant blue and can be seen a number of blocks from the facility, on Colvin, shortly after you pass the Top's store that used to be Peter's.

It is huge and almost makes Manley Field House look small. The roof of Manley by the way is exposed metal these days and looks to be badly in need of some attention.
 
Yes, stopped by yesterday afternoon. The wall on the east side was mostly finished and a large part of the roof on that side is also done or near done, at least from the outside looking in.

The outside panels of the roof are a vibrant blue and can be seen a number of blocks from the facility, on Colvin, shortly after you pass the Top's store that used to be Peter's.

It is huge and almost makes Manley Field House look small. The roof of Manley by the way is exposed metal these days and looks to be badly in need of some attention.
again with the blue man..
 

Forum statistics

Threads
170,343
Messages
4,885,779
Members
5,992
Latest member
meierscreek

Online statistics

Members online
55
Guests online
780
Total visitors
835


...
Top Bottom