I think when you enter the IPF, directly straight ahead is North.If the new Block S is going to be used at the "IPF" site, I believe that it will be located inside the building and hung on the West end of the building so when the players/recruits/visitors first come thru the inside doors to access the field that's what they're going to see. Just my opinion folks.
Supposedly some flare (flair?) is on it's way, don't remember the timing.
Ha! Put a life-sized Ricky on the wallIt’s always Flair to me
View attachment 167488
Supposedly some flare (flair?) is on it's way, don't remember the timing.
Thanks for posting the link. They did an excellent job on the Clemson IPF. I love what they did on the Syracuse BB lounge. That slatted block S in the ceiling looks incredible.
So this is the original tweet from the company that is doing the signage for the IPF. One of their last projects was the SU BB players lounge. If you look through their projects you can see what they did in the Clemson IPF.
Jack Porter
Jack Porter - We transform spaces into experiences that engage and inspire. We make where matter.www.jackporterdesign.com
http://www.jackporterdesign.com » Clemson University Football Indoor Practice Facility
www.jackporterdesign.com