TexanMark
Tailgate Guru
- Joined
- Aug 15, 2011
- Messages
- 25,680
- Like
- 48,607
1. IPF is still on track...a few issues (not money related) but they should get resolved to get it finished by Fall. BTW, really not much an issue as this winter has been colder than normal so construction would have been spotty and slow anyways.
2. The Invite only NSD Briefing by Coach Shafer is limited to Big Donors by size of facility not by desire. They are aware low/moderate level donors are not too happy.
3. Ft Drum III is supposedly on track.
2. The Invite only NSD Briefing by Coach Shafer is limited to Big Donors by size of facility not by desire. They are aware low/moderate level donors are not too happy.
3. Ft Drum III is supposedly on track.
Last edited: