OrangeXtreme
The Mayor of Dewitt
- Joined
- Aug 15, 2011
- Messages
- 228,061
- Like
- 409,128
New VIP Lounge.
New railings around the 1st level.
New ADA Ramps.
New Sprinkler system.
Miron Victory Court connecting the Arch to the Dome under construction.
ADA Parking lot at Skytop upgraded.
"Syracuse will be the most 5G connected stadium in the United States." They'd better come through after making a claim like that.Distributed Antenna System being installed for mobile phones.
Enhanced fan experience (could include mobile food ordering).
I'm glad it's coming, but this is a big stumble for JMA, not having this ready over a year after the announcement. I wonder what kind of situation this puts them in with their hopes of having SU pay for a broader private 5G network on campus for students.so really no new wifi until maybe the nov games.
Perfect capacity for the program and region.42-43K capacity after new seats are installed. Losing 2-3 seats per row.
Seems like that's the direction a lot of the newer baseball stadiums are going also.Perfect capacity for the program and region.
Need to create demand and an urgency to ticket buying.
For sure. Honestly, the lack of demand, and thus the lack of urgency, is why I gave up my season tickets 20 years ago. I knew I'd always be able to get a ticket to any game. So why buy seasons when I live 300 miles away and can maybe only make 2-3 of the games (note: I had been making 4-5 at that point, but then kids).Seems like that's the direction a lot of the newer baseball stadiums are going also.
You and my wife both!I prefer something great over something quick.