Future Campus Framework Presentation... | Page 37 | Syracusefan.com

Future Campus Framework Presentation...

Status
Not open for further replies.
It looks like, at least in this mockup, that they're using the same footprint of the dome, so I can't see how they'll get much wider concourses in there.
 
Carrier-Dome-gallery1-1.jpg

So that drawing is showing a connection to Archbold and a new building (hotel?) on the west end of the Dome.
 
It looks like, at least in this mockup, that they're using the same footprint of the dome, so I can't see how they'll get much wider concourses in there.
looks like North & East sides are expanded out. If you look at the other rendering i believe that's looking from Archbold towards the highway.
 
I know with the EFTE roof in Minneapolis, they are planning on doing flyovers again when it opens.

I think this is a real possibility. Of course, the A-10 are long gone and there are no more manned flights out of Hancock, but maybe a flyover could be arranged from Fort Drum?
You caught me in mid-edit .. i was trying to input the roof material and was looking up-thread for the acronym. ;) It doesn't have to be the A-10, but it'd be nice if we can find one still flying. Any fighter would do .. -18, or maybe one of those new, $170M stealth -35's. Mark, maybe they can load it with a "thunderDome" mission module.
 
Last edited:
Pretty cool if that is what we end up with, here's a look at the dome from close to the same angle as the drawings.

dome.JPG
 
This build-out could be pretty cool depending on what it houses.

upload_2016-5-24_10-52-25.png
 

Attachments

  • upload_2016-5-24_10-51-48.png
    upload_2016-5-24_10-51-48.png
    459.9 KB · Views: 42
It's a nice look, though I don't believe they'll go with it.

Funny that their design program seems to have the sun rising in the north-northeast - check out the shadows.
 
It's a nice look, though I don't believe they'll go with it.

Funny that their design program seems to have the sun rising in the north-northeast - check out the shadows.
th
 
It's a nice look, though I don't believe they'll go with it.

Funny that their design program seems to have the sun rising in the north-northeast - check out the shadows.
If the press release said fabrication starts this June (less than a week away), why don't you believe they'll go with it?
 
If the press release said fabrication starts this June (less than a week away), why don't you believe they'll go with it?

Just what I hear. I expect a less symmetrical design without such a heavy Archbold connection and (though it's difficult to see in this rendering) different loading/parking orientation at the Raynor/Irving intersection.
 
Status
Not open for further replies.

Forum statistics

Threads
172,342
Messages
5,011,865
Members
6,026
Latest member
Upstate33

Online statistics

Members online
243
Guests online
1,646
Total visitors
1,889


...
Top Bottom