WhoIt's as if Manley Field House and those great memories from there never existed.
Slap in the face to the Manley and Lampe families.
It's as if Manley Field House and those great memories from there never existed.
Slap in the face to the Manley and Lampe families.
The hype video is more for me than the building itself. Though the building is huge I wonder what else it will be, a cafeteria, weight room, etc or is it just gonna be rooms and study areas, and training appts?My goodness, that is a great video
It’s amazing how much money is being dumped into facilities around the country, but that’s the bar that needs to be met these days to be relevant.It is new locker rooms, meeting rooms, training facilities, health and fitness facilities, kitchen, large dining area, lounge, etc -- all of which are desperately needed if we are to compete in the ACC... where virtually all the other schools have just completed facility upgrades in the $250 million range. Take a tour of our current facilities and learn how bleak they are. The softball team locker room, or example, is about the size of a large pick-up truck, with tacky furnishings that had been rejected by a rummage sale.
This is all good.
What is the proposed completion date? It appears that SU is generally always lagging behind. As you mentioned, "all the other schools have just completed facility upgrades in the $250M range." And, with SU's pinned at approximately $150M, it would seem (as you typically get what you pay for) that we'll still be laggards in that regard. Additionally, it's likely by the time SU completes this project, our other conference members will have additional resources used to have something else in the pipeline, if not completed. And, the beat goes on.
Isn't this pretty common? Their contributions to the old facilities have been celebrated for a long time. Now new donors are helping to provide needed upgrades.It's as if Manley Field House and those great memories from there never existed.
Slap in the face to the Manley and Lampe families.
Your repeated position of SU being an ACC outlier is so tired now. Surely you must have another angle.Recruiting is more than salesmanship. Recruits and advisors look at the product being sold. When I buy a car it is because it best fits the parameters that I wanf. To put it another way, our staff would sign more highly regarded recruits if they were selling schollies to Kentucky or Duke. As an ACC outlier we need superior facilities to have a better shot at winning more recruiting battles. Our position is not easy.
Your repeated position of SU being an ACC outlier is so tired now. Surely you must
It's the first phase of a "multi-year transformation." New entryway and interior. My understanding is that the "old structures" will be completely gutted. At one point, there was also talk of a new glass facade for the entire complex.It’s hard to tell from the video but is it just a new entryway and interior? Do all the old
Structures stay and get repurposed?