I thought the smaller cranes were going to be brought inside the facility later to help take down the old fabric roof, once the new roof has been completed.i thought they said the old roof was coming down and then some smaller cranes going inside to help with the new roof?
I thought the smaller cranes were going to be brought inside the facility later to help take down the old fabric roof, once the new roof has been completed.
Thor's Hammer is being lowered into place as the first piece of the crown truss right now! Near Falk!nada going on in back. Looks like both cranes are being used in front.
We’ve already requested an interior Dome cam. Come on Pete!wont be able to see that. Old roof is coming down from inside the dome after the new roof is in place over the top of it.
Thanks for posting these, it's great to see the progress
Looks like they are going to use Walt to help hold the first one in place at least for the night.
Thanks Bees, appreciate all of your pics through the process!
I think its going to look awesome. The ring truss is massive.Looks like they are going to use Walt to help hold the first one in place at least for the night.
The size of the crown truss is going to be a lot bigger than I envisioned looking at the drawings. I think I am going to like it a lot more than I thought I was...
next piece will be interesting
Bees can you sneak into fball practice and see what the new alignment will be on the D too?
The anchor points are interesting for that first beam. It didn't look like there's enough temporary steel around the outside to hold up as many beams as they'll be attaching but I guess we'll find out!
what is Bees taking the day off?