That's the pay side with all the secret info about erectionsWhy is the site asking for my credit card info???
That's the pay side with all the secret info about erectionsWhy is the site asking for my credit card info???
Something tells me this job would be a lot simpler if they didn’t have the existing roof getting in the way. It’s ironic because some of us are openly talking as if they should’ve just cancelled this basketball season.
friggin cool
friggin cool
They drove numerous steel pilings but they didn't look like they were done with much symmetry. It kicked off my OCD AlarmI was actually just thinking today... would the pads they have fabricated the for those huge cranes be a strong enough foundation to add an addition on to the dome at some point in the future?
wow, that's close to your window. just out of curiosity, is the wind moving the load around. are the able to control it easily?
Very likely. Looks like they are trying to use JIT to run this project.new arrival - it's 1:20 Friday and a trailer just arrived with what looks like 3 new spiral steel columns. Looks like they are going all out to get the crown truss completed on time. I wonder whether the new arrivals mate with the box girder in Walt's yard?
Just in time (manufacturing technique where materials arrive just prior to installation)?OK first column's off. It's amazing that the smaller crane which is still very large can maneuver a spiral column that looks like its 60' x 3' in diameter 1/2" at a time. The operator is the surgeon here. Their hooking up another. Cool! The crane offloaded the second column swung it inside the yard then the crane must have a lot of functions because it turned the column 360 degrees with no help from the ground and then placed it alongside the first column. Tomcat - what is JIT?
Correct...Just in time (manufacturing technique where materials arrive just prior to installation)?
I thought JIT is more for mass production where you want to keep your inventory costs down. I guess it would apply here but it is probably more due to not wanting several similar pieces on-site that could potentially be assembled in the wrong spot.Just in time (manufacturing technique where materials arrive just prior to installation)?