buffalorange
2nd String
- Joined
- Aug 29, 2011
- Messages
- 677
- Like
- 1,349
Apparently that is a thing that steelworkers do on the final piece of construction as a topper or something.
Per a quick google search: “No one seems to know exactly when or how it started, but the tradi- tion of 'Topping Out' has become a cherished custom of Ironworkers whenever the skeleton of a bridge or building is completed. Topping Out is a signal that the uppermost steel member is going into place, that the structure has reached its height.
. It was finally seen by these tired eyes just now due to the lame brain who screwed the pooch with the camera and left us nothing to look at as history was made.