I assume deflation of the roof includes everything, including the steel & fabric. They need to take that down without damaging structure or the rest of the bowl so it's going to take some time.
I agree it will take time but a week to deflate and remove the whole roof? Seems incredibly optimistic. The longest cables are 700 feet long and weigh 7 tons each.
 
Wow ... they gutted it. Probably easier than trying to work within a legacy configuration. Good to see steel going up though.
The portion they really "gutted" or removed was the addition that was added on after the fire.
 
We really need to think outside of the box wish we would invest like these other teams are
 
We really need to think outside of the box wish we would invest like these other teams are

Those other schools that invest big do it largely on fundraising or state money.
 
Dan's quick and easy way to obtain FREE untapped revenue for the Carrier Dome:

Sponsor the Gates. Gate B becomes the Empower Federal Credit Union Entrance. Gate C becomes the Pepsi Gate

So on and so forth.

That one's free, Pete. The next one will cost ya
 
Dan's quick and easy way to obtain FREE untapped revenue for the Carrier Dome:

Sponsor the Gates. Gate B becomes the Empower Federal Credit Union Entrance. Gate C becomes the Pepsi Gate

So on and so forth.

That one's free, Pete. The next one will cost ya
Works for MetLife Stadium, and others.
 

Forum statistics

Threads
170,665
Messages
4,904,481
Members
6,005
Latest member
bajinga24

Online statistics

Members online
40
Guests online
1,198
Total visitors
1,238


...
Top Bottom