Future Campus Framework Discussion | Page 113 | Syracusefan.com

Future Campus Framework Discussion

I was wondering what all of the commotion was just below Lawrinson and just realized it must be the staging area for the dome construction.
 

The Domeinator.
CE5ACBA5-E744-4F17-9CFA-CD9526B8AF90.jpeg


I believe that this is the flavor of the beast that will be working on the Dome.
 
If another Labor Day storm were to happen, how would the crane fare? I’m sure wind load is factored in but to what degree?
 
Yes, is being placed on West (Irving Ave Side), they removed the steps and prepared the surface just for the crane, I don't know if they plan on just keeping it on that side, and that is why it is so tall; so can place the "track" even on the far east side..
 

Forum statistics

Threads
174,706
Messages
5,281,320
Members
6,197
Latest member
skytop124

Online statistics

Members online
236
Guests online
4,673
Total visitors
4,909


Top Bottom